A Future Tool Development Project
Joachim Schmitz (JS395-RIPE)
Requirements
- tool for RR and Internet routing
- precise project definition
- does it fit in with RIPE
- overlap with RIPE NCC activities?
- distinguish from other areas?
- tool to be used by "everybody"
- or -
results to be made available by RIPE NCC?
RIPE NCC Activities and Expenditures 1997
- Registration
- PI assignment
- Address allocation to local IR
- AS number assignment
- Coordination
- RIPE database software
- RIDE
- RR maintenance
- consistency
- redundancy
- gaps
- errors
- RR tools
- New Activities
- Routing information service
display exterior routing information from European Internet
(near real time, history)
- Test traffic measurement
traffic test station software
BOF held at RIPE 27
RR Tools
- Overview
- PRIDE Tools
- prtraceroute
- prcheck
- prpath
- not implemented: prconfig, prconn
- RATools
- RtConfig
- roe
- aoe
- prtraceroute, prcheck, prpath
- peval
- CIDR advisor
- pmatch
- IRRv
- Rsd
I n t e r n e t
+-------------------+
| routers | . . . . . . . . . . . . .
+
+----------------------> |life configuration| <----------------------+
.
| +-------------------+ |
.
| | |
.
| monitoring | RtConfig |
.
| and setup | |
.
| v |
.
| | |
.
v /| v
v
+-------+ / | aoe, roe
+-------+
| | <-----------------+--|------------------------------------> |
|
| | / |
|
| | / |
|
| I S P | <-----------------+---------------------------------------- | I R R
|
| | pmatch, prtraceroute, IRRv |
|
| | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . > |
|
| | prpath, prcheck, peval, CIDR advisor |
|
| | <---------------------------------------------------------- |
|
+-------+ whois, wais, web
+-------+
| ^
| |
+---------------------------------------------------------------------+
mail
------> unidirectional relation
<-----> bidirectional relation
. . . > possible relation
The following dicussion during the Routing WG session at RIPE27 showed
that important tools already exist or are currently developed by other
parties. It was generally felt that there is no immediate need for a
RIPE tool development project. However, this area should be regularly
reviewed (see
Routing WG
minutes).